華星東方承建的江蘇省鹽城市響水生物質(zhì)發(fā)電項(xiàng)目煙氣凈化工程通過(guò)72+24小時(shí)試運(yùn)行

中國(guó)電力網(wǎng)發(fā)布時(shí)間:2022-07-13 11:17:34

華星東方公司承建的江蘇省鹽城市響水生物質(zhì)發(fā)電項(xiàng)目煙氣凈化工程于2021年6月25日通過(guò)72+24小時(shí)試運(yùn)行。

The flue gas cleaning (FGC) project undertaken by Huaxing East for Xiangshui, Yancheng biomass power plant passed the 72 + 24 hours trial operation on June 25, 2021.

該項(xiàng)目新建1×130t/h高溫超高壓生物質(zhì)循環(huán)流化床鍋爐,配1×30MW發(fā)電機(jī)組。煙氣處理采用旋風(fēng)除塵+噴射干法脫硫+布袋式除塵工藝(包含脫硫劑存儲(chǔ)及輸送系統(tǒng)、工藝水系統(tǒng)等),為我司EPC工程。

The plant built 1×130 t/h high temperature & ultra-high pressure biomass circulating fluidized bed boiler, and equipped 1×30 MW generator set. The FGC adopted cyclone dust removal + dry injection desulfurization + bag filter including reagent storage and conveying system, process water system, etc. The FGC is an EPC project of Huaxing.

目前華星東方在江蘇省的業(yè)績(jī)涵蓋包括:錫東二期、無(wú)錫益多、淮安、鹽城大豐、連云港、宜興熱電、泰興、盱眙、宿遷、常州金壇、徐州、張家港等多個(gè)項(xiàng)目。

The reference projects of Huaxing in Jiangsu include East Wuxi phase II, Yiduo Wuxi, Huai'an, Dafeng Yancheng, Lianyungang, Yixing thermoelectricity, Taixing, Xuyi, Suqian, Jintan Changzhou, Xuzhou, Zhangjiagang, etc.